TOOLS AND MATERIALS MANAGEMENT SYSTEMS

Professor Iris D. Tommelein, Principal Investigator

This research was conducted and the publication prepared thanks to funding provided by the New Horizons Foundation.
Any opinions, findings, and conclusions or recommendations expressed in this material are those of the author(s) and do not necessarily reflect the views of the New Horizons Foundation.

Summary

Tool and material management includes identifying the needed tools and materials, acquiring them, and issuing them to the fabrication shop, job site or service truck for use or installation. It also includes returning or disposing of excess materials and managing the return, maintenance, repair and replacement of tools.

Poor tool and material management hampers operations on a day-to-day basis and can do damage to your business. The cost of owning and providing tools may amount to only a few percent of the cost of doing construction work, but it can significantly impact labor productivity and the quality of work performed. Further, poor practices in tool and material management can be indicative of other systemic wastes, hidden in your company’s day-to-day work, such as lack of planning, poor scheduling, poor housekeeping, unsafe work, and problems with quality.

This guide provides practical considerations, tactics and processes that apply specifically to managing tools, equipment and off-the-shelf, consumable materials. It provides an easy-to-reference list of considerations, tactics, and processes for implementation and ongoing improvement. Additionally, the study details the four step process (Plan, Do, Check, Act) as a way to foster learning and create a culture of continuous improvement.

Publication

This 46-page document is available for purchase on-line at the New Horizons Foundation.

| Prof. Iris D. Tommelein | Project Production Systems Laboratory (P2SL) | E&PM Program | Civil & Environmental Engineering Department | U.C. Berkeley |

IDT / 28 September 2005